Projects

Current

Carbis Bay

After successfully delivering the first two phases at a development in Carbis Bay, Ionic are now quickly progressing through Phase 3. The phase includes various types of plot foundations, the installation of several attenuation tanks, a number of retaining walls and site-wide roads and kerbs.

Kingsteignton

Ionic broke ground at a site in Kingsteignton in 2023. The project includes 24 industrial units as well a factory and office spaces. Foul and surface water drainage have been installed with the main access carriageway to follow. S278 works, plots foundations and a large reinforced concrete floor slab will ensue in the new year.

Teignmouth

Work has commenced on a new 250 unit housing development at Teignmouth. Ionic have begun undertaking substantial earthworks to remodel the challenging site. Phase 1 foundations, drainage and road construction will follow on in the new year with phase 2 currently at the review stage.

Previous

Lifton

Ionic successfully completed all works at a development of 20 dwellings in 2023. The works undertaken throughout the entirety of the project included, site preparation, earthworks, drainage, reinforced concrete, roads, block paving and site-wide finishings.

Harlyn

A development of high specification apartments was completed in 2023 with Ionic delivering on several services. These included, site enablement works, S278 works, site-wide drainage, surface water attenuation, plot foundations, walling and finishings.